Assessment of a New Regional Water Source
Water & Sewer, Reports, Studies
Details
| Department/Division | Public Works |
|---|---|
| Author/Issuer | CBCL Limited |
| Publication Date | 08/01/2022 |
| Description | In 2016, CBCL Limited (CBCL) completed the St. John’s Regional Drinking Water Study for the City. The study identified that the Maximum Day Demand (MDD) for Bay Bulls Big Pond water treatment plant exceeds the reliable yield of the watershed and is anticipated to continue to increase. The study identified two potential additional water sources: Thomas Pond and Big Triangle Pond/Southern Peak Pond. In December 2019, CBCL was awarded the Assessment of a New Regional Water Source project by the City. The project is divided into two phases; the first phase is to refine the reliable yield estimates of the two potential sources identified in the 2016 study. The second phase is to complete other assessment work for one or both potential sources, including treatability assessments, water transmission infrastructure evaluations, and cost estimating. |
Stay in Touch
Sign up to receive information from the City of St. John's directly to your inbox. Check out the various categories of general news, and emergency notifications.